Cocksedge Colleges

Jesus College, Cambridge

Client

Jesus College

Duration

Completion Date

27 months

April 2017

BRIEF OVERVIEW

Extensive demolition & remodelling works

Design & build

 

The Webb Building

This phase (completed December 2015) involved extensive remodelling of a grade II listed building to provide student accommodation, conference facilities, common rooms, offices, and a commercial grade kitchen with dining hall.

 

Café Pavilion & Basement Party Room

This phase is connected to the grade II listed Webb Building consisting of a frameless glazed, laminated oak timber frame pavilion above ground. The glazed pavilion is sited on top of a larger basement bar/party room below ground directly adjacent to the existing structure.

 

The Rank Building

This phase involved the deconstruction of an existing 1970’s reinforced concrete framed building with only the columns and floors remaining. The new construction provides 27 number 4* quality hotel grade accommodation, a new state of the art auditorium and Conference facilities, lifts, and a new structure to house the entrance and reception areas.

Download Full Case Study