KMG Systems, Factory Extension, Gamlingay

Project Scope

An extension to KMG Systems factory premises to house additional facilities for the manufacture of food processing systems

Approximate Value

£3.5 million

Client

KMG Systems Ltd

Completion Date

April 2021
BRIEF OVERVIEW

The 2800m2 factory extension has been formed with double pitched and lean-to steel portal frames clad with composite insulated cladding sheets and includes areas of engineering and facing brick walling. The cast-insitu ground floor slab has a power-floated finish to house a Spray Paint Booth, Fitting Shop and Marshalling and Racking Areas. Office accommodation has been provided with a mezzanine structure and a gantry hoist runs the length of the new factory. The scheme also includes extensive external works with brick-weave access, loading and parking areas, surrounded by acoustic and security fencing.

Early engagement with our supply-chain specialists ensured a coordinated approach for inclusion of services apertures and suitable secondary steelwork and cladding flashings. All Mechanical and Electrical Services installations have been completed by our in-house division ABS Services. Site operations, phasing and access arrangements were carefully pre-planned with KMG Systems to ensure the existing factory could remain fully operational throughout the construction works.

IN DETAIL

Download The Full Case Study

Download
Contact Us
Discover the next steps towards your successful building project.
Contact Us
Discover the next steps towards your successful building project.
Cocksedge Building Contractor
Cocksedge Building Contractor
Cocksedge Building Contractor
ABS Joinery
Copyright © 2024 Cocksedge Building Contractors Ltd
web design cambridge